Scope of work
We test the installation and hand over a report ready for acceptance.
We carry out acceptance tests on new installations and the periodic tests a plant has to repeat at set intervals. We measure the effectiveness of shock protection and insulation resistance and record the results in a report that is ready to hand on. Our SEP-certified technicians do the testing, and we agree the date and any shutdowns with the plant.
CH 01Acceptance testsWe check a new installation before it is put into service.
CH 02Periodic testsWe carry out the tests the plant has to repeat at set intervals.
CH 03Protection and insulationWe measure the effectiveness of shock protection and insulation resistance.
CH 04ReportWe describe the results in a report that is ready to pass on straight away.
- Stage 01Test scopeWe agree which installations and equipment need checking and whether it is an acceptance or periodic test.Result of the stageList of test points
- Stage 02Date and shutdownsWe agree the date and any shutdowns so production does not have to stop.Result of the stageAgreed date
- Stage 03InspectionWe check the condition of the installation, labelling and protection devices.Result of the stageInspection results
- Stage 04MeasurementsWe measure fault protection, insulation resistance and other required parameters.Result of the stageTest results
- Stage 05Assessment and recommendationsWe describe what works correctly and what needs fixing.Result of the stageList of recommendations
- Stage 06ReportWe hand over a report ready for acceptance or for the plant's records.Result of the stageTest report
What we provide
Our people hold the certifications, and we agree the date with the plant.
SEPOur testing technicians hold SEP certificates (Polish electrical qualification certificates) for operation, supervision and testing.
- ISO 9001Our system covers testing work on technical equipment.
- Date agreed with the plantWe agree the date and any shutdowns with the plant to disrupt production as little as possible.
Related services
We often combine testing with other work.
Quote
We prepare the quote based on this information.
Quote
5/5- 01Scope of work: description, diagrams or equipment list
- 02Size of the investment
- 03Plant location and industry
- 04Planned start date and duration
- 05Whether the plant will be running during the work




