Scope of work
We route the pipework, install it and test it for leaks.
We build process and utility piping: we set out the route, prepare supports and pipe sections, then install, weld and leak test the line before start-up. Our welding is certified by TÜV Rheinland to EN ISO 3834-2. We have installed piping for food and pharmaceutical plants in every part of the world.

- Stage 01Scope and routeWe agree the pipe route, media and connection points.Result of the stage: Agreed route
- Stage 02Quote and scheduleWe price the work and plan it around the plant's operation.Result of the stage: Offer and schedule
- Stage 03Supports and prefabricationWe install supports and prepare pipe spools.Result of the stage: Supports and spools ready
- Stage 04Installation and weldingWe install and weld the pipework on site.Result of the stage: Installed pipework
- Stage 05Pressure testsWe test for leaks and prepare the system for flushing and start-up.Result of the stage: Test reports
- Stage 06HandoverWe hand over the installation and the as-built documentation.Result of the stage: As-built documentation
What we provide
We weld pipework to certified procedures.
EN ISO 3834-2Our welding is certified by TÜV Rheinland, including for pressure equipment. PrefabricationWe prepare supports and pipe sections before we go on site. ISO 9001Our system covers welding work and the installation of machinery and equipment.
Reach
We have installed process systems in every part of the world.
Quote
We prepare the quote based on this information.
Quote
5/5- 01Scope of work: description, diagrams or equipment list
- 02Size of the investment
- 03Plant location and industry
- 04Planned start date and duration
- 05Whether the plant will be running during the work