Scope of work
We record every part of the line before we disconnect it.
We move production lines to a new hall or to another country and start them up on site. We record every part of the line before disconnecting it, then dismantle, label, transport and reassemble it through to start-up. For work abroad we handle posting, permits and training, and our crews have also worked on production lines abroad.
Old locationNew location
- 01Line surveyWe document the line, its connections and how to split it into modules.
- 02Dismantling and markingWe disconnect the line and mark cables and parts for transport.
- 03TransportWe organise the transport of the modules, abroad as well.
- 04Installation and start-upWe install the line at the new location and start it up together with the plant team.
- Stage 01Line surveyWe document the line, its connections and how to split it into modules.Result of the stage: Line description
- Stage 02Relocation planWe plan dismantling, transport and reinstallation with dates.Result of the stage: Relocation schedule
- Stage 03Dismantling and markingWe disconnect the line, mark cables and parts and prepare them for transport.Result of the stage: Line ready to move
- Stage 04TransportWe organise the transport of the modules, abroad as well.Result of the stage: Line at the new site
- Stage 05Installation and connectionWe install the line at the new location and connect power and utilities.Result of the stage: Line installed
- Stage 06Start-upWe start the line up together with the plant team and hand over the documentation.Result of the stage: Line running
Quote
We prepare the quote based on this information.
Quote
5/5- 01Scope of work: description, diagrams or equipment list
- 02Size of the investment
- 03Plant location and industry
- 04Planned start date and duration
- 05Whether the plant will be running during the work