Scope of work
The cabinet is built in our workshop, and only the hook-up is left on site.
We assemble and fit out power and control cabinets in our workshop in Brzesko before they go to site. We prepare the documentation, mount and wire the equipment, and every cabinet passes quality tests and receives CE marking. We can assemble more than 20 cabinets a month, and our cabinets run in plants in every part of the world.
In-house
01DocumentationWe build to the client's documentation or to our own design, with enclosures and components from any manufacturer.
02Assembly and wiringWe build and wire power and control cabinets in our workshop in Brzesko, more than 20 cabinets a month.
03Quality control and CE declarationWe check and start up every cabinet before dispatch and include the CE declaration with the delivery.
On site

- 04Delivery and installationWe deliver the cabinets to the client and can also carry out the complete process installation, with loop checks and I/O tests, depending on the scope of the offer.
Stage 01Documentation and selectionWe review the schematics and select devices and enclosures together with the client's designer.Result of the stage: Approved documentation Stage 02Quote and dateWe price the cabinets and agree the delivery date to site.Result of the stage: Offer and delivery date Stage 03Workshop prefabricationWe build and wire power and control cabinets in our workshop.Result of the stage: Assembled cabinets Stage 04Quality testsThe cabinets go through quality tests before they leave the workshop.Result of the stage: Quality test reports Stage 05Delivery and installationWe deliver the cabinets to site, position and connect them.Result of the stage: Cabinets in place Stage 06Commissioning and documentationWe commission the switchgear and hand over the as-built documentation with CE marking.Result of the stage: As-built documentation
What we provide
That is why the work on site takes less time.
Less time on siteThe cabinets arrive on site assembled and tested.
20+ cabinetsThat is how many power and control cabinets our Brzesko workshop can build in a month.
Quality tests and CEEvery cabinet passes quality tests before dispatch and receives a CE declaration.
Quote
We prepare the quote based on this information.
Quote
5/5- 01Scope of work: description, diagrams or equipment list
- 02Size of the investment
- 03Plant location and industry
- 04Planned start date and duration
- 05Whether the plant will be running during the work

