In Nienburg on the Weser, work was carried out on the installations of process tanks.
Cable routes were run in an arc along the tank walls. Vertical sections branch off the main route to fittings, valves and junction boxes, and the cables enter the tanks through wall penetrations.
The cables were laid in layers and separated by colour, which makes them easy to tell apart during service. Cabling was also brought to the valve groups under the tanks.
Pipework and technical media were installed on this site as well.