Scope of work
We come out, find the cause and fix the fault.
We handle breakdowns 24 hours a day, seven days a week. After a call we come out, find the cause, fix the electrical or mechanical fault and describe the repair in a report, so the line gets back to work as quickly as possible. We hold SEP qualifications for operation and supervision, and we have supported production at Okocim Brewery since 2022.
- 01CallWe take breakdown calls by phone, at night and at weekends as well.
- 02DiagnosisWe find the cause of the fault and define the scope of the repair.
- 03RepairWe fix electrical and mechanical faults on site.
- 04ReportWe describe what happened, what we did and what we recommend for the future.
Contact
All breakdowns are reported to one number.
E-mails are answered during office hours, so in a breakdown the fastest way is to call.
- Stage 01CallWe take the call at any time and record a description of the breakdown.Result of the stage: Call logged
- Stage 02Arranging the visitWe decide who comes and when, and pass this on to the plant straight away.Result of the stage: Arrival time
- Stage 03Making it safeOn site we isolate and tag energy sources before we start work.Result of the stage: Safe workplace
- Stage 04RepairWe find the cause and fix the fault.Result of the stage: Fault fixed
- Stage 05Start-upWe check that everything works and start the line up together with the plant team.Result of the stage: Line running
- Stage 06ReportWe describe the breakdown, the work done and our recommendations.Result of the stage: Call-out report
What we provide
When the line stops, every hour counts.
- 24/7
- We take calls around the clock, seven days a week.
- SEP
- We hold SEP licences for operation and supervision.
- Since 2022
- We have been supporting production at the Okocim Brewery since 2022.
Related services
After a breakdown we can look after the installation for good.
Quote
We prepare the quote based on this information.
Quote
5/5- 01Scope of work: description, diagrams or equipment list
- 02Size of the investment
- 03Plant location and industry
- 04Planned start date and duration
- 05Whether the plant will be running during the work




